Once you ve leveled your floor you can install the laminate pad.
Level concrete floor before laminate.
How forgiving is vinyl in regard to an unlevel subfloor.
I began laying and now i ran into an area at the base of my staircase that dips in the middle.
Lay laminate flooring on the rest of the concrete floor in the same manner described above.
Fill any low spots with a cementitious leveling compound following the manufacturer s directions and allow it to dry before proceeding.
The floor is not level or square built in the 70 s.
Feather the edges so they blend in with the surrounding floor.
Before you install file flooring follow the directions above for fixing high spots and low spots in a wood or concrete subfloor.
Another option is use ceramic tile although i think we should still attempt to level it for that as well but i just don t want ceramic tile too hard too cold don t want to spend for radiant heat and i hate hate to see dirtly grout lines.
Once the concrete has had time to cure check humidity with a moisture meter and if it is 4 5 or higher the slab might be unsuitable for laminate even with a vapor barrier.
The plywood subfloor is in good condition.
If you re on a concrete subfloor you will need to lay down a moisture barrier before applying the pad.
Check the specifications on the flooring you ve selected for moisture tolerance.
After you have completed the project you have to remove the spacers and clean the floor with a vacuum.
Work with patience and make sure you don t leave any gaps between the laminate planks.
If you have any hills or valleys that are more than that then you have an uneven subfloor that needs to be corrected.
Our concrete floor in our kitchen has a bit of a hump in it and we ll need to attempt to level it before installing laminate plank flooring.
Remember to pin down the barrier to keep it from shifting around.
Check your wood flooring manufacturer s recommendations and sand any high spots with a concrete grinder.
Then vacuum the floor with a wet dry vac or sweep it with a broom.
The floor may roll a marble and looks to slope now that the carpet has been removed.
After installing the moisture barrier select the thickest pad you can get to help level out the floor even more.
Leveling concrete basement floor before laying laminate.
Apply floor leveling compound to any low areas or dips using a trowel.
I eyeballed mistake the concrete after tearing up carpet to see if it was level for laying laminate.
The maximum laminate flooring level tolerance on a subfloor is 3 16 of an inch over a 10 foot span.
Then place the pad and get ready to install your laminate flooring.
Wait for the compound to dry prior to laminate installation.
Make a final check with the level to be sure all the high and low spots are gone.